Description
Camec Down Light LED Long Lead – Suits Camec 040864 Range Hood
Replacement LED down light with a long lead, specifically designed to suit the Camec 12V Range Hood (040864). Offers energy-efficient performance, long-lasting durability, and easy installation.
Lead approximately 70cm.
Diameter 67mm.




